What it is

Job costing compares what a job earns with what it costs. Financial › Job Costing shows it for every project ("Contract value against material, labour and other cost, for every project.") and for every service contract and one-off job. Each project also has its own job costing page, and the same figures show on the project's Costing tab.

Job costing only reads. It changes nothing except the item a quoted line is matched to.

Where each figure comes from

FigureComes from
Contract valueThe project's awarded quotations, without tax. "Contract value excludes tax."
Material quotedThe quotation lines whose section is a material section.
Material actualStock issued to the project by stock outs, at the price at issue, and stock blocked for it, at the last purchase rate.
Labour quotedThe quotation lines whose section is a labour section.
Labour actualProject expenses, by their category's cost type: the Labour ones.
Other expensesProject expenses, by their category's cost type: the Other ones.
Total costMaterial actual, labour actual and other expenses together.
Margin and Margin %Contract value less total cost, and that as a share of the contract value.

Stock issued and blocked comes from the Catalog and inventory module: see How a project's materials move from allocation to the site. Expenses come from Financial › Expenses and from paid expense claims: see Add a project expense.

A job with no awarded quotation and no contract value reads "Not tracked". A figure marked "est." is estimated.

Cost types: Material, Labour, Other

Every cost is sorted into one of three cost types: Material, Labour or Other.

  • Quotation sections have a cost type. A section without one is sorted by its title. Sections are set on the quotation: see Add sections and lines to a quotation.
  • Expense categories have a cost type. A category without one reads as Labour if its key is labour, otherwise as Other, and is flagged "Cost type not set (reads as Labour)" or "Cost type not set". You can set it from the project's job costing Summary with Set type. See Read a project's job costing.

The margin colour

The margin is coloured against your company's margin threshold, which is 15% unless DuctArchitect has set another figure for you:

  • green: at or above the threshold plus 5 points (20% by default),
  • amber: from the threshold up to the threshold plus 5 points,
  • red: below the threshold.

No screen changes the threshold.

Material lines

On the Materials tab, each quoted line is compared with what was issued: Exceeded, Nearing, On track or Not quoted. Items used but not quoted, and quoted lines that match no catalog item, are listed apart. See Reconcile a project's materials on job costing.

How it moves

Job costing has no status of its own. The figures move as the project's records do:

  1. A quotation is awarded: the contract value and the quoted material and labour appear.
  2. Stock is blocked or issued to the project: material actual rises.
  3. Project expenses are added, or expense claims charged to the project are paid: labour actual or other expenses rise, by the category's cost type.
  4. The margin changes with each of them.

The From and As on dates limit the cost to a period: "As on [date], cost from [date]." After Set type, reload the page to see the figures move: "Cost type saved. Reload to see the figures move."

Who is involved

RoleWhat they do
Owner and AdminRead job costing for every project and service job. By default they are the only roles with Financial Management.
A person given Financial Management and View on Job costing sheetsThe same. Cost and margin columns need Can see purchase costs and Can see profit and margin.
EstimatorsAward the quotation that gives the contract value. See Accept or reject a quotation.
StoresBlock and issue stock to the project.
Anyone who records project expensesAdds labour and other cost.

Job costing must be switched on: the Job Costing module is off by default for Design & Consultation firms. See Financial, Job Costing, Expense Claims or Project Financials is missing.