The panel shows on a project's BoQ stage for anyone with View on BoQs, and on a standalone BoQ's page. Its actions need Operation Management.

Before there is a BoQ

"Three ways to build the BoQ. Nothing is invented, lines with no source data stay manual."

ControlWhat it doesNeeds
1 · Pull from calculations with Template and Generate BoQBuilds the BoQ from the project's calculations, using a template: "Auto: by system type", "Blank", or one of your templatesAdd on BoQs; project BoQs only
Takeoff rule setShows "Default (IS 655)"Shown only when enabled
2 · Manual entry: Start blank (manual)Starts an empty BoQAdd on BoQs
3 · Template upload: Excel Format, UploadDownloads the import file, and imports a filled oneAdd on BoQs

On a draft BoQ

ControlWhat it doesNeeds, and when it shows
Status badge, Single rate or Supply + LabourThe BoQ's status and rate structureAlways
Labour viewA switch for the labour view of the linesAlways
BadgesThe legend of the badges on linesAlways
Default markup %, Rate structureThe BoQ's markup and rate structureDraft; markup needs Can see purchase costs
RegenerateRebuilds the lines from the project's calculationsProject BoQs, not imported ones
Save statusShows whether your changes are saved: "Saved" on the toolbar, next to Regenerate. The labels are "Save", "Retry save", "Saving…" and "Saved · [time]"Draft
FinalizeLocks the BoQEdit on BoQs; at least one line
Regenerate QuotationShown when a quotation was already made from this BoQNot for a consultant firm
Excel FormatDownloads the import file
Apply templateAdds a template's linesEdit on BoQs; the BoQ Templates and BoQ List module is on
Refresh rates from inventoryUpdates supply rates from the latest priced lot in inventoryCan see purchase costs
Bulk UploadImports lines from Excel
Export TenderExcel (.xlsx); PDF (priced) and PDF (unpriced)PDF only when the Tender BoQ PDF module is on
Save as TemplateSaves the BoQ as a templateOwner, Admin or Manager role

A long BoQ shows a short sticky toolbar with the same items in a ⋯ menu and Jump to….

On a finalized BoQ

ControlWhat it doesNeeds, and when it shows
ReopenBack to DraftEdit on BoQs
Push to ProcurementSends mapped lines to the project's procurementProject BoQs; not for a consultant firm; Add on Procurements; the project is not Tender or Lost
Generate Quotation or Regenerate QuotationCreates or updates a draft quotation from the BoQNot for a consultant firm; Add on Quotations

Approved Makes

The Approved Makes card ("Tender annexure"): "Category → approved manufacturers (e.g. Jindal / TATA / SAIL). Appears as an annexure in the tender export."

Standalone BoQs

A standalone BoQ has no Regenerate, no Pull from calculations, no takeoff rule set picker, no Push to Procurement and no mapping badges.

Badges

BadgeMeaning
DraftEditable.
FinalizedLocked. Reopen to edit.
As receivedImported: "quantities are not derived from calculations. Takeoff Regenerate is disabled."