The panel shows on a project's BoQ stage for anyone with View on BoQs, and on a standalone BoQ's page. Its actions need Operation Management.
Before there is a BoQ
"Three ways to build the BoQ. Nothing is invented, lines with no source data stay manual."
| Control | What it does | Needs |
|---|---|---|
| 1 · Pull from calculations with Template and Generate BoQ | Builds the BoQ from the project's calculations, using a template: "Auto: by system type", "Blank", or one of your templates | Add on BoQs; project BoQs only |
| Takeoff rule set | Shows "Default (IS 655)" | Shown only when enabled |
| 2 · Manual entry: Start blank (manual) | Starts an empty BoQ | Add on BoQs |
| 3 · Template upload: Excel Format, Upload | Downloads the import file, and imports a filled one | Add on BoQs |
On a draft BoQ
| Control | What it does | Needs, and when it shows |
|---|---|---|
| Status badge, Single rate or Supply + Labour | The BoQ's status and rate structure | Always |
| Labour view | A switch for the labour view of the lines | Always |
| Badges | The legend of the badges on lines | Always |
| Default markup %, Rate structure | The BoQ's markup and rate structure | Draft; markup needs Can see purchase costs |
| Regenerate | Rebuilds the lines from the project's calculations | Project BoQs, not imported ones |
| Save status | Shows whether your changes are saved: "Saved" on the toolbar, next to Regenerate. The labels are "Save", "Retry save", "Saving…" and "Saved · [time]" | Draft |
| Finalize | Locks the BoQ | Edit on BoQs; at least one line |
| Regenerate Quotation | Shown when a quotation was already made from this BoQ | Not for a consultant firm |
| Excel Format | Downloads the import file | |
| Apply template | Adds a template's lines | Edit on BoQs; the BoQ Templates and BoQ List module is on |
| Refresh rates from inventory | Updates supply rates from the latest priced lot in inventory | Can see purchase costs |
| Bulk Upload | Imports lines from Excel | |
| Export Tender | Excel (.xlsx); PDF (priced) and PDF (unpriced) | PDF only when the Tender BoQ PDF module is on |
| Save as Template | Saves the BoQ as a template | Owner, Admin or Manager role |
A long BoQ shows a short sticky toolbar with the same items in a ⋯ menu and Jump to….
On a finalized BoQ
| Control | What it does | Needs, and when it shows |
|---|---|---|
| Reopen | Back to Draft | Edit on BoQs |
| Push to Procurement | Sends mapped lines to the project's procurement | Project BoQs; not for a consultant firm; Add on Procurements; the project is not Tender or Lost |
| Generate Quotation or Regenerate Quotation | Creates or updates a draft quotation from the BoQ | Not for a consultant firm; Add on Quotations |
Approved Makes
The Approved Makes card ("Tender annexure"): "Category → approved manufacturers (e.g. Jindal / TATA / SAIL). Appears as an annexure in the tender export."
Standalone BoQs
A standalone BoQ has no Regenerate, no Pull from calculations, no takeoff rule set picker, no Push to Procurement and no mapping badges.
Badges
| Badge | Meaning |
|---|---|
| Draft | Editable. |
| Finalized | Locked. Reopen to edit. |
| As received | Imported: "quantities are not derived from calculations. Takeoff Regenerate is disabled." |
