Stages by firm type

Your firm type is set on Modules & Firm Type. See Change your firm type. Stages are listed in the order they appear on a project.

StageDesign & ConsultationExecution & InstallationDesign-Build (both)
Heat Load CalculationYesNoYes
Site SurveyYesYesYes
System Type SelectionYesNoYes
Pipe SizingYesNoYes
Ductwork PlanningYesNoYes
Ventilation & Fresh Air PlanningYesNoYes
BoQYesYesYes
Material AllocationNoYesYes
InstallationNoYesYes
System Testing & BalancingNoYesYes
Inspection & ComplianceNoYesYes
Commissioning & HandoverNoYesYes

Pipe Sizing, Ductwork Planning and Ventilation & Fresh Air Planning depend on the project's system type. Until the system is confirmed on the System summary panel of AC Unit Recommendations, they read "Awaiting system selection". Once it is confirmed, a stage the system does not need is hidden, or reads "Not applicable to selected system" if it already holds work. See A stage says "Awaiting system selection" or "Not applicable to selected system".

Limit the stages for your company

On System Settings, under Work Stages Configuration, the switch Enable Custom Stage Selection limits new projects: "When ON, only the stages you select below may be included in new projects." Stages already used in existing projects are locked and cannot be removed. See Choose which work stages new projects can include.

Building Model and Duct Layout

StageWhen a new project gets itWhere it goes
Building ModelYour company has the Building Model module switched on, and DuctArchitect has turned it on for youFirst in the list
Duct LayoutYour company has the Duct Layout module switched on, and DuctArchitect has turned it on for youAfter Pipe Sizing

Both modules start off for every firm type. See Switch a module on or off. If you switch a module off later, projects keep the stage; only its tool button hides.

A project created before Duct Layout was switched on can get the stage afterwards. See Add the Duct Layout stage to an older project. There is no such button for Building Model.

The preview on Add Project

Under Load & System, Add Project shows "Stages this project will get", with a count and the stage titles. Some titles carry " (if ducted)". The preview does not follow your firm type or Work Stages Configuration, and it always lists Building Model. So the new project can have fewer stages than the preview shows. See The Duct Layout or Building Model stage is missing.

Retired and renamed stages on older projects

What you seeWhat it is
Design DrawingsA retired stage. New projects have not got it since 19 September 2026. Older projects still show it, with an upload area only, and it can still be finished.
Equipment ProcurementA retired stage, hidden on every project. The Kanban board can still show a column for it.
"Building Drawing" in the stage panel titleThe old name of Building Model. The stage list shows Building Model.
"Procurement" in the stage panel titleThe old name of Material Allocation. The stage list shows Material Allocation.