Add Project

The form is the same for every firm type. Your firm type only changes which stages the project gets. Fields are listed in screen order, from Client Information to Additional Options. Client Information ("Contact details and project location") holds the first four fields. Project Information ("Basic project details and specifications") starts at Project Name and holds Load & System, Utility Type, Priority Level, Unit System and Currency.

FieldRequiredWhat to enter, options and default
Select Enquiry (optional)NoAn open enquiry, found by enquiry number or customer. Fills the client fields and makes the project start as Tender. Shown only with View on Enquiries. No enquiry (clear selection) removes it.
Client NameYes"Select or type a client name". Pick a client, or type a name and select Use "[name]" as a new client. Add new client… opens the add client box, with Add on Customers.
Client Email (Optional)NoAn email address.
Client PhoneYes7 to 15 digits, with the country flag.
Project NameYesUp to 100 characters.
Project TypeYesNew Installation, System Replacement, Repair & Maintenance, System Upgrade or Inspection & Assessment.
Project CountryYesStarts with your company's country. "Sets the standard load-calculation engine below and centres the site map."
Load & System: Load IntentYesCooling (default), Heating or Both.
Load & System: System typeNoOne per side, for cooling and heating. Starts from the country.
Load & System: EngineNoOne per side. Starts at "Select engine". An engine for your country is marked "Recommended for your region".
Load & System: Chilled-water ΔT (°C) / Hot-water ΔT (°C)NoShown for water-based systems only. Defaults 5.5 and 10.
Utility TypeNoDefault residential. "Applies to all spaces in this project, sets internal-heat (sensible/latent) values."
Priority LevelNoLow, Medium (default) or High.
Unit SystemYesImperial (ft, sq ft) or SI / Metric (m, sqm). Starts with your company's unit system, else Imperial.
CurrencyNoStarts with your company's currency. Locked once the project is created.
Project DescriptionNoFree text.
Start DateYesA date. "You can select today's date or any date up to 1 month in the past"
End Date (Optional)NoA date, not before the start date. The same day as the start shows "⚠ End date equals start date, project duration will be 1 day."
Estimated Project ValueNoA positive amount. "Your internal estimate. The contract value comes from the accepted quotation."
Duration (Days)Read only, marked Auto. Worked out from the start and end dates.
Contract Value (if already agreed)NoA positive amount. "Leave blank if this job will be priced through a quotation."
CityYesPick from the country's cities, or type it when the country has none. Up to 50 characters. "No matching city: pin it on the map below."
Street AddressYesStart typing and pick the suggested address.
State (optional)NoFree text.
ZIP Code (optional)NoFor example 12345, 12345-6789 or 123456.
LandmarkNoUp to 255 characters.
Latitude (Optional) / Longitude (Optional)NoRead only. Set from the map, the address search or Use Current Location. The reset icon clears them.
Project Radius (meters)No1 to 10,000. Default 100.
Select Location on MapNoSelect the site on the map.
Project ManagerNoAn active user, or No manager assigned (default). + Add new manager opens "Add New Manager" with the role set to Manager.
Requires building permitsNoTick box.
Has existing HVAC systemNoTick box.
Additional NotesNoFree text.

Under Load & System, "Stages this project will get" lists the stages with a count. See Which stages a new project gets.

The buttons are Cancel and Add Project (it reads Creating... while it saves). If a field is wrong, a message names it: "Please fix [number] fields: start with [label]...".

Edit Project: what is different

Edit Project ("Update project details and information") has the same fields, grouped as Project Information, Client Information, Site Address, Project Details and Additional Options. The differences:

Field or areaOn Edit Project
StatusIn Project Information, beside Priority, after Utility Type and before Unit System and Currency. Pending, In Progress, Completed, and Won only when the project is Won. Forward only. See I can't change a project's status back.
PriorityLow, Medium, High.
Unit SystemImperial (ft, °F, gr/lb) or SI / Metric (m, °C, g/kg). "Affects calculator units for duct & HVAC sizing"
Currency"Used for budget & cost display"
Select ClientLinks a client record. While one is linked, client name, email and phone are locked.
Contract ValueWith an awarded quotation: "Contract value comes from quotation [number]". For a tender: "This project is out for pricing. Its contract value arrives with the accepted quotation." For a lost project: "This project was marked lost, so there is no contract value." Otherwise Contract Value (if already agreed).
Estimated Duration (Days)Read only, marked Auto-calculated.
"Limited Editing Mode"Shown once the project is in progress, completed or started. Start date, end date and location are locked. The radius is locked when "Work sessions exist for this project". See Dates, location or client are locked on Edit Project.
System typeChanging it when stages would be affected opens a warning with Cancel and Continue.

The buttons are Cancel and Update. With View but not Edit on Projects, the form is read only and has no Update button.