AC unit recommendations
Confirm the system, choose AC units or plant from your items, and save the selection to the project
Confirm a project's system, then choose the AC units, VRF units or plant that meet its heat load, from your own items. The selection is saved on the project's System Type Selection stage.
Confirm the system
Choose equipment
- DoChoose room split units for each spaceOn a room split project, choose a unit and quantity for every space in the Units per space table, using the recommended size or one of your own.
- DoChoose VRF indoor and outdoor unitsOn a VRF project, choose an indoor unit for every space and the outdoor units for the block load, in the Units per space table.
- DoChoose ducted units on the block loadOn a ducted DX project, or one with no system type, choose quantities of one or more units from the card grid until the block load is covered.
- DoGet recommendations for a block-load projectLet the page rank your units against the required capacity and show the best single units, or a multi-unit combination, then set the quantities on the Choose card.
- DoChoose chilled water or hot water plantOn a chilled water or hot water project, choose the plant against the duty on the Plant equipment picker, then the fan coil units for each space.
- DoSet the design airflowRead the project's design airflow in CFM, set your own value when the heat load does not give one, or reset it to the heat load's value.
Review and save the selection
- DoSave your equipment selectionCheck the capacity and airflow verdicts in the footer, then save the chosen equipment to the project's System Type Selection stage, or discard your changes.
- DoReview the selected AC systems on the projectSee the saved equipment on the project's System Type Selection stage, with capacity, airflow, prices and the grand total, open a product's details, or delete one product.
How it works
Fix a problem
- FixOpen Recommendations sends me to Access DeniedThe System Type Selection stage shows Open Recommendations to everyone with Project Management, but the page needs Inventory Management.
- FixThe page stays on "Finding the best AC units for your project"AC Unit Recommendations never finishes loading because it was opened without a project, for example from a saved address.
- Fix"No equipment found" or "Type not set"The Choose card offers no equipment, or units show Type not set. Items are offered only when their category is AC Systems and their equipment type is set.
- Fix"No single unit" or a multi-unit or closest-options bannerGet Recommendations shows a banner instead of a plain match. What Smallest units that cover, Showing Closest Available Options and Multi-Unit System Required each mean, and what to do.
- FixDuctwork Planning or Pipe Sizing says "Awaiting system selection"The Ductwork Planning or Pipe Sizing stage is greyed out with Awaiting system selection until the project's system is confirmed on AC Unit Recommendations.
- FixA stage became "Not applicable to selected system" after I changed the systemAfter changing a project's system, a stage with work on it reads Not applicable to selected system. Its work is kept; nothing is deleted.
- FixThe verdict says short or oversizedThe capacity or airflow verdict in the footer, a space's row, or the project's selection says short or oversized. What each verdict compares, as the screen shows it.
- Fix"Failed to fetch HVAC calculation data"AC Unit Recommendations cannot read the project's heat load, because the heat load is not calculated yet or you cannot view calculations.
- FixThe grand total shows RestrictedOn the project's Selected AC systems, the Grand total reads Restricted because your role cannot see purchase costs.
- FixRemove adds a unit, or Add All to Task did not saveOn a recommended card, Remove adds one more unit; on a combination card, Add All to Task is not saved. Set the quantities on the Choose card and save there instead.
- FixI can't save the selectionSave selection or Delete product is refused because you do not have Edit on Projects, because your role is Technician or Worker, or because the project has no System Type Selection stage.
Reference
- ReferenceAC unit recommendations: who can do whatEvery action on AC Unit Recommendations and the Selected AC systems panel, which role can do it by default, the permission behind it, and the badges you will see.
- ReferenceThe System summary panel: every stateThe five states of the System summary panel on AC Unit Recommendations, with the heading, note and button each shows, the stage chips and their reasons, and the questions it can ask.
Other modules
- Getting startedSign in, your account, the dashboard and notifications
- Company and usersCompany profile, GST and branches, users, roles, permissions, modules and imports
- CRMClients, enquiries from New to Converted, and CRM reports
- ProjectsProjects, their workflow stages, to-dos, team and files
- Heat loadDesign conditions, space-by-space heat load, results in TR and downloads
- Duct designDuct Sizing: build the duct tree, size each duct, save and export
- Quotations and BoQQuotations from draft to accepted, project and standalone BoQs, templates and BoQ settings
- Catalog and inventoryItems and brands, stock in your warehouses, project materials, stock out with delivery challans, and returns
- PurchaseSuppliers, purchase orders, deliveries, returns to suppliers, and what you owe and pay
- Material requestsAsk for material for a project, a to-do or a service job, get it approved, then issue or order it
- Service and maintenanceAMC, service and warranty contracts, visits, technicians, billing and machines
- FinancialInvoices, payments, expenses, job costing, expense claims and financial reports
- AccountsChart of accounts, ledgers, vouchers, banking, posting, Tally and financial statements
- HRMSEmployees, attendance, leave, salary structures and payroll
- Worker appThe phone app and the Associate Portal for field workers and technicians
- Help and supportHow to use this site and how to reach us