What it is
A load engine is the method used to calculate a space. DuctArchitect has five:
| Engine | What the screen says about it | Sides | Badge |
|---|---|---|---|
| E-20 Cooling Load Method | "Worksheet method based on the Carrier System Design Manual. Common practice in India and GCC." | Cooling | none |
| Radiant Time Series (RTS) | "Per ASHRAE Handbook of Fundamentals 2021." | Cooling | Preliminary |
| Residential Block Load (US) | "Simplified estimate." and "Not for permit submission." | Cooling and heating | Preliminary |
| EN 12831-1 Design Heat Load | "Per EN 12831-1:2017." | Heating | Preliminary |
| Simplified Admittance Method (UK) | "Based on CIBSE Guide A. Not the full hourly admittance procedure." | Cooling and heating | Preliminary |
A project chooses its engines in Add Project or Edit Project, under Load & System:
- Load Intent (Cooling, Heating or Both) decides which sides the project has.
- Engine on each side picks the engine. The cooling list offers E-20, RTS, Residential Block Load (US) and Simplified Admittance Method (UK); the heating list offers EN 12831-1, Residential Block Load (US) and Simplified Admittance Method (UK). The engine for your company's country is marked "Recommended for your region".
See Add Project and Edit Project: every field.
How it moves
E-20 spaces are worked on the HVAC Spaces screen. See How a project's heat load is worked out.
On the other four engines a space moves like this:
- Draft: New space creates the space, named "Space [number]".
- Calculated: Calculate saves the inputs and calculates the space. A later Save of changed inputs shows the status the space is in afterwards.
There is no delete or cancel for these spaces.
A space calculated on RTS, Residential Block Load (US), EN 12831-1 or Simplified Admittance Method (UK) shows Preliminary. The badge's tooltip reads "Preliminary: pending engineering validation. Do not use as design-of-record." The badge is fixed when the space is calculated. See A calculation shows "Preliminary".
On Residential Block Load (US) and Simplified Admittance Method (UK), cooling and heating are shown in two cards: "Cooling and heating are never summed together. Each is sized independently."
Who is involved
| Role | What they do |
|---|---|
| Anyone with Add or Edit on Projects | Chooses the load intent and the engines in Add Project or Edit Project. |
| Anyone with Operation Management and Add on Duct and load calculations | Creates spaces with New space. |
| Anyone with Operation Management and Edit on Duct and load calculations | Saves and calculates spaces. With View only, the form is read only. |
